Bathroom improvements

As soon as I started to rework my axonometry (project 3.2) I found that I do not like this bathroom anymore. It is not contemporary enough, I feel that the space can be used better, customer wanted the limestone or glass basins, the gap between bath and wall is too narrow. I need to rework it totally from the scratch. I know it is stupid to create more work for myself when nobody asked. But I know what is going to happen next – I will hate this project more and more and I would not be happy with final view of rendered axonometry. Interior design supposed to be my dream job, so it is just not right to work on something I do not like anymore. Several steps back – start from concept board and walls.

Before:

After:

That is better! Now it ticks all boxes: contemporary, limestone basins, storage, huge unusual bath, tall shower, relaxing and luxury! I spend one day on it instead of weeks on the first one and this is a good sign – proper design comes with inspiration and fun, it is easy to do, like dancing :)

***

I know what was wrong. Last time I started from shopping – I made selection of furniture, lights and sanitary equipment. Selection looked luxury and contemporary enough, so I only tried to place it into room. This time I thought about client more, I planned the space for him first and all shapes came up. That is how I learn that the Design Analysis is not just exercise from the first module, it is the first stage of every project :) Now axonometry again. And I have to rework my booklet with furniture and materials too. It is the project from second module, but I need to do it as everything is changed now.

About these ads

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s